Nadir#

The SWOT simulator can be used to generate any nadir like observation. The mission ephemeris should be provided as explained in Generation of the SWOT grid section. The corresponding cycle_duration and the height of the satellite value should be specified. Default values are for the SWOT mission:

  • cycle_duration=20.86455 days

  • height=891000 m