Nadir#
The SWOT simulator can be used to generate any nadir like observation. The
mission ephemeris should be provided as
explained in Generation of the SWOT grid section. The corresponding
cycle_duration and the
height of the satellite value should be
specified. Default values are for the SWOT mission:
cycle_duration=20.86455daysheight=891000m